ENG

ENG


PLACING BOOM
KB-M52RZ
SPECIFICATION

 MOMENT [KNm]

Position of boom

→ + 

Moment(boom side)

- →

Moment(Counter weight)

Deduction moment

I

with concrete

in pipe-line

2,080 kNm

1,205 kNm

875 kNm

II

without concrete

in pipe-line

 →

1,165 kNm

← 

1,205 kNm

40 kNm


MOMENT [KNm]

In operation : 33,400 Kg

Out of operation : 31,950 Kg


 MOMENT [KNm]

Position of boom

Wind-exposed area 

Center of gravity distance

remark

I

II

--

30.5 M² / boom-side

29.7 M² / boom-side

6.3 M² / Counter weight-side

Xs I = 14.9 m

Xs II = 10.2 m

Xs B = 7.5 m

Wind surface perpendicular 

to frontal wind

I/II 

3.3 M²

Ys = 1.6 m 

Exposed area in 

frontal wind


Absolute altitude [m]

0-8

80-20

20-100

100 over

W [kNm2]

800

1280

1760

2080


F = W x Aw F = wind force, W = lateral thrust due to wind, Aw = wind surface area 

Exterior Layout PDF DOWNLOAD

664e71a297d8b6436393039bbee728bc_1655181719_2782.jpg
 

SPECIFICATION
Exterior Layout

312, GWANGJEONG-RO, GAYA-EUP, HAMAN-GUN, GYEONGSANGNAM-DO, 52052, REPUBLIC OF KOREA
Tel: +82-55-580-9000 E-mail: info@kcppump.com
Copyright(c) All right reserved.